View and download all project documents published from the launch of our Phase One consultation in July 2020 until the end of our Phase Three consultation in April 2022.

CWWTPR Site Announcement Report

CWWTPR Site Announcement Webinars FAQ Summary

CWWTPR – Stage 4 – Non-Technical Summary

CWWTPR – Stage 4 Final Site Selection – Appendix C Community assessment

CWWTPR – Stage 4 Final Site Selection – Appendix D.1 Anglian Water’s operational requirements

CWWTPR – Stage 4 Final Site Selection – Appendix B Environmental assessment

CWWTPR – Stage 4 Final Site Selection – Appendix A Drawings

CWWTPR – Stage 4 Final Site Selection – Main Report

CWWTPR – Stage 4 Final Site Selection – Appendix N SSSI IRZ Review Addendum

CWWTPR – Stage 4 Final Site Selection – Appendix M Preliminary Odour Study

CWWTPR – Stage 4 Final Site Selection – Appendix L Historic environment report

CWWTPR – Stage 4 Final Site Selection – Appendix K Preliminary transport assessment

CWWTPR – Stage 4 Final Site Selection – Appendix J Green Belt study

CWWTPR – Stage 4 Final Site Selection – Appendix I Flood risk screening assessment

CWWTPR – Stage 4 Final Site Selection – Appendix F Planning assessment

CWWTPR – Stage 4 Final Site Selection – Appendix G Programme assessment

CWWTPR – Stage 4 Final Site Selection – Appendix H Nature conservation and biodiversity assessment tables

CWWTPR – Stage 4 Final Site Selection – Appendix E Economic assessment

CWWTPR – Stage 4 Final Site Selection – Appendix D.2 Access

CWWTPR – Stage 4 Final Site Selection – Appendix D.3 Flood risk

CWWTPR – Stage 4 Final Site Selection- Hydrogeological Impact Assessment